Material & Personnel Traffic Management

The Process

Janbury, working in a supportive roll with Construction Management, would assist in the day-to-day administration of traffic movements into and around the site. Janbury recognizes that due consideration always needs to be given to the “critical path” at various stages of the contract to enable progress to be maintained. To that end, regular meetings between Janbury, Construction Management, and Trade Subcontractors will be ongoing. Therefore, Janbury, the Construction Management, and Trade Subcontractor can then prepare for their anticipated delivery and can schedule the necessary resources accordingly.

Single Source Responsibility

Combining Janbury’s services such as Material Hoisting, Traffic Management, and Safety services under a single source responsibility would result in a synergy of distinct advantages:

 Greater control over deliveries, staging and stocking

 Increased safety with barricade removal and replacement

 Manufacturer specified inspection of hoisting equipment and devices

 Pre-task safety meeting to review hoisting plan and posting of restricted zones

 Remove and clean obstructions to facilitate safe and timely stocking

Janbury can offer a tailored Personnel and Materials Traffic Management program insuring that both traffic and deliveries are received in a planned, safe, and controlled manner. A site specific detailed Traffic Management Plan would be produced the Construction Management in conjunction with Janbury. If implemented from the beginning of the project, the provision of a strict delivery management system will instill a positive pro-active management culture.

Material Hoisting

As previously noted, if Construction Management elects to employ other additional services provided by Janbury such as Waste Management, there will exist certain economies of overlaps in scope. For example, the same hoisting equipment utilized for Waste Management debris removal can be readily available for Material Hoisting. Not only could the same hoisting equipment be utilized but there would also be additional economies of both skilled and unskilled personnel.

Vertical Personnel Traffic Management

Janbury can also install and maintain safe building access systems for Personnel. Construction Management, in conjunction with Janbury, can a create site specific recommendations for Vertical Personnel Traffic Management. Again, Janbury can provide a single source for installation, maintenance, relocation, and final removal. Where existing vertical material and personnel lifting equipment is already in place, Janbury can provide supervisory personnel to operate said equipment to insure safety and efficiency of use.

Traffic / Security Personnel Movement

Our Janbury Traffic Operatives are normally responsible for the following:

 Managing the safety & efficiency of traffic management for site access / egress

 Managing the pre-agreed delivery schedule for arriving vehicle deliveries

 Ensuring the subcontractors strictly adhere to designated lay down areas, restrictions, and specifications

 Considering the safety of third parties at all times as part of the total Traffic Management program

 Ensuring that the procedures agreed to are implemented and adhered to

 Report directly to Construction Management such events as; incidents or unsafe acts, non-complying vehicles or drivers, violation of site rules/policies

 Assist with emergency situations

 Assist non-construction personnel to ensure their safety on site

 Monitor site signage regarding traffic management

 Monitor the cleanliness of vehicles leaving the project to ensure the integrity of the roadways

 Assist the Construction Management and Subcontractors at scheduled meetings to keep up changing environment and future construction activities as it impacts Traffic Management.